Com B: AHEF AZ.09, Technical assistance for consultancy services on Advanced Meter Infrastructure (AMI) application at Azerenerji’s distribution networks

Objective

Technical assistance for consultancy services on Advanced Meter Infrastructure (AMI) application at Azerenerji’s distribution networks.

The overall objective of the Technical Assistance that the INOGATE programme has agreed with Azerenerji JSC is to assist the development and installation of an integrated system of Advanced Metering infrastructure (AMI) across the electrical distribution network of Azerbaijan, and to assist the connection of the AMI with a Metering and Data anagement System (MDMS) and the corresponding Billing System.

INOGATE’sTechnical Assistance has been split in to two stages:

•The first stage consisted of the preparation and submission of the report regarding the optimum AMI system design and the evaluation of the pilot AMI projects that have been installed and performed by three candidate vendors;

•The second stage (subject to EC approval) will consist of technical support to the preparation of a Request for Proposals (RFP) and the evaluation of bids. It is anticipated that (subject to EC approval), this support will continue during the installation and commissioning of the system.

Key Data

Parent project

New INOGATE Technical Secretariat and integrated programme in support of the Baku Initiative and the Eastern Partnership energy objectives

Country

Azerbaijan

Thematic Areas

Energy markets

Activity Types

Country Requests (AHEFS), Event

Implementation period

31 October 2014

Location

Baku (Azerbaijan)

Document and Publications

Document title ▴▾ Language Type Date ▾
Appendix 7.4, Photos of Pilot Smart meters en, ru 31/10/2014
Shenzhen Star Instrument Co., Ltd. Three Phase Keypad Prepayment, Energy Meter (model А) – Product Design Specification en, ru Other 31/10/2014
Appendix 7.5, Advanced Meters Infrastructure (AMI) at Azerenerji`s distribution network Pilot Projects Evaluation, Guaranteed Level of System Performance – Acceptance Test en, ru 31/10/2014
Shenzhen Star Instrument Co., Ltd. Three Phase Keypad Prepayment, Energy Meter (Type В) - Design Specification en, ru Other 31/10/2014
Appendix 7.6, Letter for study tour en, ru 31/10/2014
Shenzhen Star Instrument Co., Ltd. Three Phase Keypad Prepayment, Electronic Energy Meter (Type C) - Design Specification en, ru Other 31/10/2014
Appendix 7.7-ENEL presentation en, ru 31/10/2014
Shenzhen Star Instrument Co., Ltd. Star AMI Management System clarifications en, ru Other 31/10/2014
Technical assistance for consultancy services on Advanced Meter Infrastructure (AMI) application at Azerenerji’s distribution networks en, ru Other 31/10/2014
Teleconference with Rafael Abbasof en, ru Other 31/10/2014
Responses to INOGATE questionnaires en, ru Other 31/10/2014
“Sumgayit RES” Limited Liability Company and “Azerfon” Limited Liability Company. Agreement on provision of connectivity for the operation of advanced metering infrastructure en, ru Other 31/10/2014
Extract from Service Level Agreement (SLA) en, ru Other 31/10/2014
Extract from PDP Agreement en, ru Other 31/10/2014
AzerEnerji AMI Project. Azerfon Requirements. Final Version en, ru Other 31/10/2014
Mobile contractual specs en, ru Other 31/10/2014

Advanced Filter

Countries
Armenia
Azerbaijan
Belarus
Georgia
Kazakhstan
Kyrgyzstan
Moldova
Russian Federation
Tajikistan
Turkey
Turkmenistan
Ukraine
Uzbekistan
 
Thematic Areas
Energy policy
Energy tariffs
Energy markets
Energy standards
Energy security
Renewable energy
Energy efficiency
Energy investments
Energy statistics
 
Document Types
Status report
Project reports
Final Report
Agenda
Training material
Presentation
Studies
Policy documents
Agreement
Other
KEY DOCUMENT